F. Out bye conveyor system: Conveyor system of 9 Km long from longwall gate belt (Underground) to Coal Screening Plant(CSP) is installed and commissioned with 11 Conveyor belts with installed capacity of about 12 MW. Huge civil foundations were prepared, some of which were on dumped over burden (OB). To prepare the civil foundations on Over Burden