This was for a 6x4m room with a step in the ceiling at the bay and it took him 2 days, 1 to prep (he removed as much artex as possible then PVA'd) and 1 to plaster. I had a different plasterer do the same in another room including 3 walls and again it took 2 days and that costs £350.